Skip to main content

NCC Bahrain

  • Must work according to the Ready-Mix Site Supervisor and Dispatch Supervisor’s instructions.
  • Pump operator must always check whether hydraulic oil is within operational parameters and water tanks are full.
  • Must Inspect the boom for evidence of both hydraulic leaks or pipeline leak.
  • Ensure that pump is properly primed and hopper is clean and free.
  • Make sure that Safety devices must not be altered or removed.
  • Ensure stability of unit, when in doubt of ground condition; use extra blocking under outrigger legs. Operate unit on level ground.
  • Make sure that area should be cleared before extending outriggers or swinging boom.
  • Outriggers must be fully extended before boom is opened/extended or operated.
  • Do not drive with an unfolded placing boom or unrestricted outriggers.
  • Do not move truck pump assembly with boom extended/unfolded.