Must work according to the Ready-Mix Site Supervisor and Dispatch Supervisor’s instructions.
Pump operator must always check whether hydraulic oil is within operational parameters and water tanks are full.
Must Inspect the boom for evidence of both hydraulic leaks or pipeline leak.
Ensure that pump is properly primed and hopper is clean and free.
Make sure that Safety devices must not be altered or removed.
Ensure stability of unit, when in doubt of ground condition; use extra blocking under outrigger legs. Operate unit on level ground.
Make sure that area should be cleared before extending outriggers or swinging boom.
Outriggers must be fully extended before boom is opened/extended or operated.
Do not drive with an unfolded placing boom or unrestricted outriggers.
Do not move truck pump assembly with boom extended/unfolded.